Equipment Development

Equipment Development

Special equipment is used for CLP corrosion within the seismic gap (2 inches). After gap observation and thickness measurement (UT), the CLP thinning area is identified, and the location and size of the temporary attachment are checked. (Participation in KPS partners)

Get Professional Help with engineering solution

+82-51-714-5545

CALL ANYTIME OUR
TO EXPERTS

After determining the thinned CLP within the seismic gap (2 inches), build-up welding or CLP replacement is performed. We perform PT, VBT and UT tests. When a temporary attachment is found within the seismic gap (2 inches), it is cut with a dedicated device. Post-injury PT examination is performed. (Participation in KPS partners)

After confirming the area under the 2-inch gap, crush the concrete with the dedicated equipment to secure the seismic gap (2 inches).

Automation and special equipment